Friday, March 18, 2011

Week 2 of Demo






I'm lucky enough to have found the contractor who built the original addition, and he's as good and efficient as it gets. He, "Buzz", is a ball of energy and has come up with a lot of creative ideas, not to mention saving me some major bucks in the process. Already he has: fixed my gutter, removed all the vinyl suspended ceilings; removed all the beadboard that was overpowering the living room; cut a larger opening into the kitchen/dining area that has opened the front room significantly; removed vinyl wall panels elsewhere, hauled all that crap out, and figured out some of the quirky aspects of my cottage. Next: spackle/recover damaged sheetrock, set ceiling w/beadboard, remove all carpet, add base/ceiling moldings, install a new door, ceiling fans, and then I'll be able to paint. Yay!

1 comment:

  1. Week 2 was a productive week for you, because you found the contractor who made the original additions to your house. This surely made the process much easier, because he was already familiar with it. And it's amazing that he got a lot of work done in such a short period of time. Cheers!

    Meghan Bowers @ Gutter Dome

    ReplyDelete