The final phase of renovation plans will start March 2014! In the meantime, here is the living room and RV kitchen as of January 2014.
![](https://blogger.googleusercontent.com/img/b/R29vZ2xl/AVvXsEjtSuELJFcf_RxJzdXheI7WJslFVGoXS9uXSaKB0vCZT3ngA39ux_42y81trvDw58Jmfo0FBTRkhnQLzwEJNof3AearGh04_wENxig0o9e_Dbo9vuCpIEqkQsDgm_zH0OpVlpj03OxmE2x1/s320/lr+teaser.jpg)
Interior renovations were slow and few in 2012-2013. Having so little light in the the living area, I stole light from the next room by cutting a symmetrical door entry. The double openness looks kinda wacky, but I'm hoping that sliding doors on barn tracks will add character (and privacy as needed). What else? I had the RV kitchen gutted of its original paneling and insulation. The plan is to re-insulate, install drywall, and wallpaper with grasscloth. Lesson learned: A gutted RV will attract moisture problems (and critters) unless a vapor barrier/insulation is installed ASAP. I also had the living room's ceiling and subfloor painted in glossy latex. Oh, and I found a fantastic wicker sofa on Craigslist. And that's about it.
This is my ambitious plan for spring 2014:
--Insulation of cracks; correction of drywall holes.
--Xtreme cleaning and proofing against stinkbugs, mice, and spiders with lemon, eucalyptus, and mint essential oils.
--Installation of drywall and wallpaper in RV kitchen.
--Painting of all rooms in bright white and adding window/door trim.
--Removal of faux stone fireplace backing and replacement with stucco or something textural.
--Installation of vinyl wood plank flooring and shoe molding in all rooms.
--Installation of kitchen sink base for the butcher block countertop and sink/spigot that I already have.
--Installation of sink base in tiny bathroom and repair of shower stall.
--Installation of sliding interior doors and new exterior lite-panel door leading to patio.
--Moving all furniture and decor!
Progress and pics to be posted...